THE RENEWABLE ENERGY ECOSYSTEM

One campus. Seven ventures.
20 years of technology ecosystem building in Costa Rica's renewable energy heartland.
Now open for investment.

Invenio

Connected by Design

Invenio Campus: 20 years operating our technology ecosystem, 7 active partners, and land ready for renewable deployment in a region hosting 360+ MW of generation capacity.
Invenio cluster aerial view

Invenio's campus in Cañas, Guanacaste, Costa Rica brings together a dual-engineering university, high-end connectivity, critical-infrastructure tenants, and a dedicated free zone. Built over two decades, it's an ecosystem where technology, education, and energy converge.

Free Zone Benefits
Private Biological Reserve
Expansion Capacity
Strategic Location
Operating Infrastructure
Privileged Renewable Resource

The only dual-engineering university campus in Costa Rica, paired with a dedicated free zone for critical-infrastructure tenants, in a region with 360+ MW of installed generation capacity.
Real synergies: engineering talent, renewable energy, high-performance computing, high-end connectivity, a free-zone regime, and integrated conservation.

Operating Partners

Seven entities generating real synergies: trained engineering talent, renewable energy, high-performance computing, high-end connectivity, free zone regime, and integrated conservation.

Invenio Dual University

Invenio Dual University

Talent Pipeline

Costa Rica's only dual engineering university with mechatronics, industrial, and IT degrees. 20 months work experience at graduation. Local talent for ecosystem operations.

Private Biological Reserve

Private Biological Reserve

Conservation & ESG

On-campus private biological reserve. ESG credibility aligned with SDG 7/9/13. Attractive structure for green bonds and impact finance.

Invenio Free Zone

Invenio Free Zone

Free Zone Regime

Regulatory and fiscal framework enabling the ecosystem: 100% income tax exemption for 12 years, import duty exemptions, and municipal tax exemptions. Self-consumption energy generation permitted.

Continum Data Center

Continum Data Center

Anchor Demand

Critical 24/7 infrastructure, base electricity consumer. Can market services as "powered by local renewables."

OneWeb Satellite

OneWeb Satellite Portal

Connectivity

LEO satellite ground station. Strengthens Continum's value prop with low-latency global connectivity. Enables smart grid monitoring.

Invenio AI + Cloud Cluster

Invenio AI + Cloud Cluster

High-Performance Computing

AI compute infrastructure powered by local renewables. Colocation for high-consumption loads within the free-zone ecosystem.

Invenio Energy

Invenio Energy

Energy Infrastructure

Structuring solar, wind, BESS, microgrids for ecosystem self-consumption and beyond.

Costa Rica in Context

30 years of deliberate transition into a high-tech powerhouse.

500+

Multinationals in Free Zones

98-99%

Renewable Electricity Grid

30

Years of Tech Transition

Bilingual

Technical Workforce

Current vs. projected generation: the energy transition underway.

The market opportunity based on Costa Rica's official renewable expansion plan.

Source: ICE PEG 2024-2040, Table 15.2

On-site Kick-off Opportunity

0+ MW
Planned On-Site Capacity
0+ ton
Annual CO2eq Reduction
0+
Equivalent Homes Powered
0
Full Deployment Target

Our Journey

From the founding vision in 2006 to Invenio Energy's commercial activation.
Two decades of strategic development.

Completed

Genesis of the Vision

Since 2006, the vision has been to build a hub in Guanacaste with enabling capabilities for regional development and high-impact projects.

2006

Completed

Strategic Groundwork & Environmental Commitment

Sustainability and conservation as a guiding principle for the campus (biological reserve), aligned with the country's energy transition.

2008

Completed

Park Validation & Regional Role

Strengthening the hub outside the Greater Metropolitan Area to attract investment and operations, enabling linkages for energy initiatives.

2015

Completed

Critical Infrastructure as Anchor Demand

Deploying critical infrastructure reinforces the energy thesis: where critical operations exist, the need for resilience, optimization, and hybrid architectures with storage grows.

2016-2017

In Progress

Renewable Market Window

ICE plans 2,125 MW of new capacity by 2040, including 240 MW of battery storage (BESS). Costa Rica needs storage, demand management, and grid flexibility.

2024-2040

Coming Soon

Invenio Energy Commercial Activation

Launch phase to structure and scale initiatives: solar, wind, energy storage (BESS), microgrids, self-consumption solutions, and investment attraction.

2026

Invenio Energy Infrastructure Pipeline

Energy infrastructure initiatives under development within the Invenio ecosystem,
from solar generation to microgrids and self-consumption. Partnership opportunity.

Solar Energy
In Progress

Solar Energy

Placement and development of photovoltaic solar generation projects, leveraging Guanacaste's privileged solar irradiation for ecosystem self-consumption.

Wind Energy
In Progress

Wind Energy

Exploring wind generation opportunities, complementing solar capacity with the region's consistent wind resource.

In Progress

Energy Storage (BESS)

Battery energy storage systems to stabilize intermittent renewable generation and provide energy backup for the cluster and regional grid. Self-consumption model with guaranteed off-take.

In Progress

Microgrids & Self-Consumption

Microgrid solutions for critical cluster loads, consumption optimization, and operational resilience with distributed generation and storage.

Invest With Us

Contact

Write to us to explore investment opportunities in the Invenio renewable energy ecosystem.

Invest With Us

Investment Opportunities

We seek strategic partnerships to develop the renewable energy ecosystem in Costa Rica.

Strategic Investors

Capital for clean energy projects in a free zone

Infrastructure Funds

Institutional investment in renewable energy assets

Technology Partners

Solar, wind, BESS, microgrids, and smart energy solutions

EPC Partners

Engineering, procurement, and construction for solar, wind, and storage

Off-Taker / Anchor Clients

Guaranteed anchor electricity demand from operating ecosystem tenants (24/7 data center, university, satellite ground station)

ESG & Green Finance

Private biological reserve on campus, aligned with SDG 7/9/13. Attractive structure for green bonds and impact finance

Co-development model: we structure joint projects for solar, wind, energy storage (BESS), and microgrids within the free-zone ecosystem.

By clicking submit, you consent to allow Invenio Energy to store and process the personal information submitted above to provide you the content requested.

You may unsubscribe from these communications at any time. For more information on how to unsubscribe and our privacy practices, please review our Privacy Policy.